E2DESIGNLAB
  • Home
  • About
  • Services
  • Partners
  • Projects
  • Team
  • Blog
  • Contact
  • Twitter
  • Linked In
  • Email
P1030111
Harris Street Permeable Paving
WSUD Design & Construction
Permeable Paving Testing

Infiltration Testing for Permeable Pavement Systems

City of Melbourne

The City of Melbourne has installed permeable pavements in a number of locations. E2Designlab assisted the City of Melbourne with permeability testing and cleaning to determine whether these assets were infiltrating water as expected or were clogged. All assets presented with a degree of clogging ranging from moderate to severe while most were still infiltrating significant volumes of water. Cleaning of sample sites and re-testing was then undertaken. The outcomes demonstrated that cleaning of permeable pavements is necessary and that it could effectively restore infiltration capacity. The project led to recommendations for all permeable pavements to be cleaned with subsequent testing to allow the frequency of cleaning to be refined to achieve a cost-effective maintenance program for the City’s permeable pavement assets. The project has given the City confidence to proceed with future permeable pavement installations and a better understanding of the level of commitment to ongoing maintenance required to ensure sustainable operation of these assets.

Large Scale Alternative Water Supplies

Toolern Integrated Water Cycle Management Strategy Designs

Integrated Community Water Planning

Sydney Science Park Integrated Water Design

Asset Maintenance

Streetscape WSUD Asset Auditing, Maintenance and Rectification

Channel naturalisation

Small Creek Naturalisation Stages 1, 2 & 3

WSUD for Schools

St Gregory’s College Water Sensitive Urban Design

Passively irrigated trees

Upper Mary Street Revitalisation

Stormwater Treatment Design

Bellvista Estate Streetscape WSUD

Urban development solutions

Everley Estate Multifunctional WSUD Assets

Stormwater Harvesting for Open Space Irrigation

Royal Park Wetland and Stormwater Harvesting System

Priority Stormwater Treatment and Harvesting Design

Priority WSUD Projects: Gordon Barnard Reserve and Macleay Park

Retrofit Solutions

Allgas Street Stormwater Disconnection and Riparian Rehabilitation

Linked Harvesting Networks

Eltham Corridor Stormwater Harvesting Network

WSUD for New Development

Sunbury Hills WSUD Strategy

Stormwater Harvesting

Elsternwick Park Stormwater Harvesting

WSUD for Residential Developments

Harcrest Residential Development

Innovative wetland design

Torhaven WSUD and Stormwater Treatment Ephemeral Wetland

Flood Mitigation

Elizabeth Street Catchment Flood Risk Reduction Study

Stormwater harvesting

Alma Park Stormwater Harvesting Scheme

WSUD for Public Realm

Western Precinct Raingarden and Wetland Design